Leads/a8fbbfb8
Approved · unknown

CCCL — Storage Facilities (Francisca Dobjanschi)

#17 South Seas Plantation Rd., Captiva

Load estimate pending
Lifecycle
Permitted as of May 24, 1999
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Storage Facilities (Francisca Dobjanschi)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (27y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8012244 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
ALICO ROAD QUARRY · Miami
One-way
27.7 mi
Round trip
55.3 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
quarryALICO ROAD QUARRYMiami27.7 mi55.3~100m$230–$290
quarryFort Myers MineJacksonville29.8 mi59.5~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples29.7 mi59.3~100m$230–$290
quarryFort Myers QuarryFort Myers30.3 mi60.7~100m$230–$290
quarryJayrockPunta Gorda31.8 mi63.5~100m$230–$290
quarrySRM Materials Punta GordaMurfreesboro32.5 mi64.9~100m$230–$290
quarryBermont Materials AlicoPunta Gorda32.6 mi65.2~100m$230–$290
sand pitWashington Loop MinePunta Gorda33.4 mi66.9~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80122442026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/a8fbbfb8