Leads/a8da1851
Approved · unknownPASCO County

USACE 404 — 5925 RIO DRIVE [DOCK]

5925 RIO DRIVE, NEW PORT RICHEY, FL, 34652

~90loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of May 15, 2017
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 5925 RIO DRIVE [DOCK]

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/15/2017 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$929K
Actual — from source record
Acreage
0.36 ac
Parcel 08-26-16-0130-00B00-0060
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
MOUNT RICHARD K & LAURIE A
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~90 est. loads (+6) | stage=permit_issued, but stale (9y old) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0354034-001-EE from fdep_spgp
  2. 2026-06-03PASCOPA
    Captured PASCOPA_08-26-16-0130-00B00-0060_a8da1851 from pascopa
  3. 2026-07-06FL_DOR_CADASTRAL
    Captured FDOR_08-26-16-0130-00B00-0060_a8da1851 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
16.1 mi
Round trip
32.2 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill16.1 mi32.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.4 mi34.8
quarryCentral State Aggregates LLCZephyrhill26.3 mi52.7
quarryTampa Cement Grinding PlantTampa27.4 mi54.8
quarryBrooksville QuarryBrooksville29.0 mi58.1
quarryBrooksville South Cement PlantBrooksville29.8 mi59.7
quarryCalcium PlantJacksonville32.5 mi65.1
quarryCenter Hill MineBrooksville36.4 mi72.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
MOUNT RICHARD K & LAURIE A

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0354034-001-EE2026-05-28Open ↗
pascopaPASCOPA_08-26-16-0130-00B00-0060_a8da18512026-06-03Open ↗
fl_dor_cadastralFDOR_08-26-16-0130-00B00-0060_a8da18512026-07-06Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
08-26-16-0130-00B00-0060
Strap
08-26-16-0130-00B00-0060
Address
5925 RIO DRIVE, NEW PORT RICHEY
Zip
34652
Acreage
0.36 ac
Sq ft
15,682
Use
Improved
Owner of record
MOUNT RICHARD K & LAURIE A
Last sale
2018-07-16
$507,500
Appraiser valuation
Just (market)
$886,209

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/a8da1851