Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — KINGS MOBILE
615 W BLOOMINGDALE, BRANDON, FL, 33511
~22loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 9, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — KINGS MOBILE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.089 ac
Parcel 0744440000
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922359 from fdep_cleanup_sites
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88085706 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_0744440000_3cd06abd from hcpa
- 2026-06-29HCPACaptured HCPA_0744440000_a6144242 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.6 mi
Round trip
19.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 9.6 mi | 19.1 |
| quarry | Caloosa Materials | Ruskin | 15.9 mi | 31.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.5 mi | 42.9 |
| quarry | Four Corners | Lithia | 21.6 mi | 43.3 |
| quarry | South Pasture Mine | Lithia | 27.2 mi | 54.4 |
| quarry | Wingate Creek Mine | Lithia | 29.2 mi | 58.3 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 36.1 mi | 72.1 |
| quarry | South Fort Meade Mine | Lithia | 37.0 mi | 74 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87922359 | 2026-06-10 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88085706 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_0744440000_3cd06abd | 2026-06-26 | Open ↗ |
| hcpa | HCPA_0744440000_a6144242 | 2026-06-29 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 0744440000
- Strap
- U-10-30-20-ZZZ-000002-86170.0
- Address
- 615 W BLOOMINGDALE AVE, BRANDON
- Zip
- 33511
- Acreage
- 0.089 ac
- Sq ft
- 3,861
- Homestead
- NO
Owner of record
VICTORY OIL I LLC
Last sale
2008-10-30
$1,500,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/a6144242