Leads/a5b4f95b
Approved · unknownOkaloosa County

FDOT — SR 293 DANNY WUERFFEL WAY FROM SR 30 (US 98) TO MID BAY BRID GE - RESURFACING

Okaloosa County — FDOT Contract E3X88

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT — SR 293 DANNY WUERFFEL WAY FROM SR 30 (US 98) TO MID BAY BRID GE - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$1.9M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 293 DANNY WUERFFEL WAY FROM SR 30 (US 98) TO MID BAY BRID GE - RESURFACING. Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $1,892,008. | FDOT public project (+15) | size signal: $1,892,008 valuation (+12) | FDOT public project (+15) | size signal: $1,892,008 valuation (+12) | FDOT public project (+15) | size signal: $1,892,008 valuation (+12) | FDOT public project (+15) | size signal: $1,892,008 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E3X88_3 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
ALLIED SERVICES, LLC FT. WALTON TRANSFER STATION · Fort Walton Beach
One-way
14.7 mi
Round trip
29.4 mi
Closest import source (sand pit)
G2C Sand Mine · Niceville
One-way
21.5 mi
Round trip
43 mi
TypeNameCityOne-wayRT mi
sand pitG2C Sand MineNiceville21.5 mi43
sand pitMOSSEYHEAD MINESCENTURY24.9 mi49.7
sand pitMossy Head WestDothan24.9 mi49.7
sand pitMVM Landfill, LLCDeFuniak Springs25.4 mi50.7
sand pitRiver Road PitNavarre26.1 mi52.1
sand pitQuikrete MineMILTON38.0 mi76.1
sand pitSandhills Plant 2Dothan45.1 mi90.2
transfer stationALLIED SERVICES, LLC FT. WALTON TRANSFER STATIONFort Walton Beach14.7 mi29.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Okaloosa County Permits
Destin / Fort Walton Beach Building Services
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E3X88_32026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Okaloosa
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/a5b4f95b