Leads/a53a5240
Approved · unknownCollier County

FDOT — I-75 (SR 93) FROM MILE POINT 33.989 TO MILE POINT 46.000 - R ESURFACING

Collier County — FDOT Contract E1W80

Load estimate pending
Lifecycle
Completed as of Dec 11, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — I-75 (SR 93) FROM MILE POINT 33.989 TO MILE POINT 46.000 - R ESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$28.5M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — I-75 (SR 93) FROM MILE POINT 33.989 TO MILE POINT 46.000 - R ESURFACING. Vendor: OHLA USA INC. Cost: $28,457,618. | FDOT public project (+15) | size signal: $28,457,618 valuation (+20) | FDOT public project (+15) | size signal: $28,457,618 valuation (+20) | FDOT public project (+15) | size signal: $28,457,618 valuation (+20) | FDOT public project (+15) | size signal: $28,457,618 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E1W80_4 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Golden Gate Quarry · Daytona Beach, FL
One-way
6.0 mi
Round trip
12.1 mi
TypeNameCityOne-wayRT mi
quarryGolden Gate QuarryDaytona Beach, FL6.0 mi12.1
sand pit846 Mine LLCNaples9.4 mi18.9
quarrySunniland MineNaples20.1 mi40.3
sand pitCorkscrewEstero20.7 mi41.4
sand pitImmokalee DivisionJupiter22.9 mi45.8
sand pitImmokalee Sand MineMedley23.9 mi47.8
quarryFort Myers QuarryFort Myers24.3 mi48.7
quarryFort Myers MineJacksonville25.5 mi51
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Collier County Permits
Naples / Marco Island Growth Management
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E1W80_42026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Collier
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/a53a5240