Approved · unknownCollier County
FDOT — I-75 (SR 93) FROM MILE POINT 33.989 TO MILE POINT 46.000 - R ESURFACING
Collier County — FDOT Contract E1W80
Load estimate pending
Lifecycle
Completed as of Dec 11, 2024
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — I-75 (SR 93) FROM MILE POINT 33.989 TO MILE POINT 46.000 - R ESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$28.5M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — I-75 (SR 93) FROM MILE POINT 33.989 TO MILE POINT 46.000 - R ESURFACING. Vendor: OHLA USA INC. Cost: $28,457,618. | FDOT public project (+15) | size signal: $28,457,618 valuation (+20) | FDOT public project (+15) | size signal: $28,457,618 valuation (+20) | FDOT public project (+15) | size signal: $28,457,618 valuation (+20) | FDOT public project (+15) | size signal: $28,457,618 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E1W80_4 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Golden Gate Quarry · Daytona Beach, FL
One-way
6.0 mi
Round trip
12.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Golden Gate Quarry | Daytona Beach, FL | 6.0 mi | 12.1 |
| sand pit | 846 Mine LLC | Naples | 9.4 mi | 18.9 |
| quarry | Sunniland Mine | Naples | 20.1 mi | 40.3 |
| sand pit | Corkscrew | Estero | 20.7 mi | 41.4 |
| sand pit | Immokalee Division | Jupiter | 22.9 mi | 45.8 |
| sand pit | Immokalee Sand Mine | Medley | 23.9 mi | 47.8 |
| quarry | Fort Myers Quarry | Fort Myers | 24.3 mi | 48.7 |
| quarry | Fort Myers Mine | Jacksonville | 25.5 mi | 51 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E1W80_4 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Collier
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/a53a5240