Leads/a48fcaa5
Approved · unknownPINELLAS County

USACE 404 — 4009 COBIA COURT

4009 COBIA COURT, PALMETTO, FL, 34221

Load estimate pending
Lifecycle
Permitted as of Oct 24, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 4009 COBIA COURT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (9y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0348411-001-EE from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
8.3 mi
Round trip
16.5 mi · ~40 min
Rate / load
$110–$140
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.6 mi
Round trip
31.2 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin15.6 mi31.2~75m$175–$230
quarryTampa Cement Grinding PlantTampa29.5 mi59.1~100m$230–$290
quarryWingate Creek MineLithia29.9 mi59.8~100m$230–$290
quarrySouth Pasture MineLithia41.3 mi82.5~130m$290–$370
quarryFour CornersLithia42.2 mi84.4~130m$290–$370
quarryFlorida Shell & Fill Company LLCNaples43.8 mi87.6~130m$290–$370
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton8.3 mi16.5~40m$110–$140
landfillLENA RD COUNTY LFBradenton11.1 mi22.2~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0348411-001-EE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/a48fcaa5