Cypress Ridge Subdivision Phase 3 ERP Modification
Bishop Road and C.R. 579, Wimauma, FL
Qualifying 65
HotStrongWarmQualifying
permit issuedunknownother
Score breakdown — 65/100
+
3 Contractors Linked
Known companies — contact info available for outreach
Scope signals
- Permit types
- SWFWMD ERP (Individual)
- Permit status
- Issued
- acres disturbed
- 480.62
- Est. notes
- The SWPPP sheet lists total site acreage as Phase 3B = 480.62 acres overall = 531.93 acres; pre-developed 'C' factor = 0.20, post-developed 'C' factor = 0.50, indicating significant impervious cover increase. Soil boring locations (PB-15, PB-16, PB-17, PB-18) are shown on grading sheets but no soil classifications are explicitly stated in the visible sheets. CY
- Est. source
- swfwmd_erp_plans CY
- Est. drainage features
- multiple wet detention/retention ponds (Pond 2,Pond 3,Pond 4,Pond 5,Pond 6,Pond 8,Pond 9,Pond 10,Pond 11,Floodplain Mitigation Ponds 1-4,labeled on aerial and drainage plans),roadway swales,curb inlets (curb inlet types I,II,III shown on drainage details),mitered end sections,outfall sumps,ditch bottom inlets (types C,D,E,H),storm drainage structures (numerous RCP structures listed in storm structure data table on sheet 21) CY
- Est. extraction method
- claude_vision CY
- Jurisdiction
- Wimauma, FL
Company roles
Owner/Developer
Clayton Properties Group, Inc.
Owner/Developer
Highland Homes, Inc. / Joel Adams
Engineer of Record
Absolute Engineering, Inc.
Source records
swfwmd_erpSWFWMD_ERP_932637
View Sourceswfwmd_erp_plansSWFWMD_PLANS_932637_a42b2152
View Source