Leads/a37a85a2
Approved · unknownSARASOTA County

USACE 404 — SCHNEIDER, PAUL / 203903 0022 / CANAL

1600 N LODGE DR, SARASOTA, FL, 34239

Load estimate pending
Lifecycle
Permitted as of Apr 18, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — SCHNEIDER, PAUL / 203903 0022 / CANAL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (8y old) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0363090-001-EE from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
27.8 mi
Round trip
55.6 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFlorida Shell & Fill Company LLCNaples27.8 mi55.6~100m$230–$290
quarryCaloosa MaterialsRuskin27.8 mi55.6~100m$230–$290
quarryWingate Creek MineLithia28.6 mi57.2~100m$230–$290
quarry4M-31 MineAlva42.2 mi84.3~130m$290–$370
quarrySouth Pasture MineLithia43.0 mi86~130m$290–$370
sand pitWashington Loop MinePunta Gorda43.3 mi86.5~130m$290–$370
quarryTampa Cement Grinding PlantTampa43.6 mi87.3~130m$290–$370
quarryBermont Materials AlicoPunta Gorda45.0 mi90~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0363090-001-EE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
SARASOTA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/a37a85a2