Approved · unknownLeon County
FDOT — SR 261 CAPITAL CIRCLE NE OVER I-10 - BRIDGE-REPAIR/REHABILIT ATION
Leon County — FDOT Contract E3Y25
Load estimate pending
Lifecycle
Completed as of Sep 15, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 261 CAPITAL CIRCLE NE OVER I-10 - BRIDGE-REPAIR/REHABILIT ATION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$430K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 261 CAPITAL CIRCLE NE OVER I-10 - BRIDGE-REPAIR/REHABILIT ATION. Vendor: BRIDGE MASTERS CONSTRUCTION, LLC. Cost: $430,052. | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: $430,052 valuation (+5) | FDOT public project (+15) | size signal: $430,052 valuation (+5)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E3Y25_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
LEON COUNTY SOLID WASTE TRANSFER STATION · Tallahassee
One-way
7.6 mi
Round trip
15.1 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
11.6 mi
Round trip
23.2 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Silver Lake 1 | Tallahassee | 11.6 mi | 23.2 |
| quarry | Quincy Plant and Mines | QUINCY | 20.5 mi | 41 |
| quarry | Active Minerals Attapulgite Division | Quincy | 21.0 mi | 42 |
| sand pit | A-Mining Group II LLC. | Quincy | 24.1 mi | 48.2 |
| quarry | CYD Cabbage Grove | Daytona Beach | 29.6 mi | 59.3 |
| quarry | Perry Quarry | Fort Myers | 29.8 mi | 59.6 |
| quarry | SRM Materials Cabbage Grove | Lamont | 47.6 mi | 95.2 |
| transfer station | LEON COUNTY SOLID WASTE TRANSFER STATION | Tallahassee | 7.6 mi | 15.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E3Y25_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Leon
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/a2faf8ac