Leads/a19eba8b
Approved · unknownMANATEE County

USACE 404 — 1901 4TH STREET WEST, PALMETTO

1815 4TH ST W, PALMETTO, FL, 34221

Load estimate pending
Lifecycle
Permitted as of Oct 13, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 1901 4TH STREET WEST, PALMETTO

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (9y old) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0318081-002-EE from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
6.4 mi
Round trip
12.7 mi · ~40 min
Rate / load
$110–$140
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.9 mi
Round trip
31.7 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin15.9 mi31.7~75m$175–$230
quarryWingate Creek MineLithia28.5 mi56.9~100m$230–$290
quarryTampa Cement Grinding PlantTampa30.4 mi60.9~100m$230–$290
quarrySouth Pasture MineLithia40.2 mi80.4~130m$290–$370
quarryFour CornersLithia41.5 mi83~130m$290–$370
quarryFlorida Shell & Fill Company LLCNaples42.0 mi84~130m$290–$370
quarry4M-31 MineAlva49.3 mi98.6~130m$290–$370
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton6.4 mi12.7~40m$110–$140
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0318081-002-EE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
MANATEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/a19eba8b