Leads/a17c1735
Approved · planning

EASTPORT LOT 2

2116 NORTH ORIENT ROAD, TAMPA, FL, 33619

Load estimate pending
Lifecycle
Permitted as of Dec 11, 2015
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

EASTPORT LOT 2

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
FLORIDA DRIVES AND GEARMOTOS, INC.
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (10y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0183665-008-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
4.4 mi
Round trip
8.8 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa4.4 mi8.8~25m$85–$110
quarryCentral State Aggregates LLCZephyrhill17.8 mi35.6~75m$175–$230
quarryCaloosa MaterialsRuskin17.9 mi35.8~75m$175–$230
quarryFour CornersLithia28.0 mi55.9~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.6 mi61.1~100m$230–$290
quarrySouth Pasture MineLithia33.7 mi67.4~100m$230–$290
sand pitCounty Line MineSpring Hill35.0 mi70.1~100m$230–$290
quarryWingate Creek MineLithia35.1 mi70.1~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
FLORIDA DRIVES AND GEARMOTOS, INC.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0183665-008-EI2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/a17c1735