Approved · unknownBrevard County
FDOT — SR 518 (EAU GALLIE BLVD) FROM SARNO RD TO WEST OF APOLLO BLV D - PAVEMENT ONLY RESURFACE (FLEX)
Brevard County — FDOT Contract E58F0
Load estimate pending
Lifecycle
Completed as of Dec 4, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 518 (EAU GALLIE BLVD) FROM SARNO RD TO WEST OF APOLLO BLV D - PAVEMENT ONLY RESURFACE (FLEX)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$3.4M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 518 (EAU GALLIE BLVD) FROM SARNO RD TO WEST OF APOLLO BLV D - PAVEMENT ONLY R. Vendor: PREFERRED MATERIALS INC.. Cost: $3,396,325. | FDOT public project (+15) | size signal: $3,396,325 valuation (+12) | FDOT public project (+15) | size signal: $3,396,325 valuation (+12) | FDOT public project (+15) | size signal: $3,396,325 valuation (+12) | FDOT public project (+15) | size signal: $3,396,325 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E58F0_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Buck Hammock · Orlando
One-way
13.3 mi
Round trip
26.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Buck Hammock | Orlando | 13.3 mi | 26.6 |
| quarry | Brisbane Pit | Fellsmere | 19.8 mi | 39.6 |
| sand pit | Sunshine Mine | Fort Pierce | 20.8 mi | 41.7 |
| quarry | Rock Solid Rock, LLC | Titusville | 24.8 mi | 49.7 |
| sand pit | Vero Rock and Sand | Vero Beach | 30.7 mi | 61.5 |
| quarry | S & L Materials Inc | KISSIMMEE | 31.0 mi | 62.1 |
| sand pit | Blue Goose Mine | Fort Pierce | 31.4 mi | 62.9 |
| quarry | Beeline Mine | Orlando | 32.3 mi | 64.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E58F0_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Brevard
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/9dc7d8d6