Leads/9d680e94
Approved · planning

FL POWER CORP(PROGRESS ENER)

4223 SMITH ROAD, WESLEY CHAPEL, FL, 33543

Load estimate pending
Lifecycle
Permitted as of Aug 9, 2007
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FL POWER CORP(PROGRESS ENER)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
PROGRESS ENERGY FLORIDA
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (18y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0277573-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
1.5 mi
Round trip
3.1 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCentral State Aggregates LLCZephyrhill1.5 mi3.1~25m$85–$110
quarryGeorgia Stone Spring Hill QuarryAtlanta 16.0 mi31.9~75m$175–$230
sand pitCounty Line MineSpring Hill21.7 mi43.4~75m$175–$230
quarryTampa Cement Grinding PlantTampa21.8 mi43.6~75m$175–$230
quarryWest Florida AggregateWebster21.9 mi43.7~75m$175–$230
quarryBrooksville South Cement PlantBrooksville26.1 mi52.1~100m$230–$290
quarryBrooksville QuarryBrooksville26.1 mi52.3~100m$230–$290
quarryCenter Hill MineBrooksville29.2 mi58.5~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
PROGRESS ENERGY FLORIDA

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0277573-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/9d680e94