Leads/99e79dda
Approved · unknownPINELLAS County

USACE 404 — AMI RESTORATION AREA 1

SEE DIRECTIONS, SAINT PETERSBURG, FL, 33705

Load estimate pending
Lifecycle
Permitted as of Apr 3, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — AMI RESTORATION AREA 1

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/3/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0469980-001-EG from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
HOWCO ENV. SERVICES (UOP) · St Petersburg
One-way
5.2 mi
Round trip
10.5 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
12.3 mi
Round trip
24.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin12.3 mi24.6
quarryTampa Cement Grinding PlantTampa20.2 mi40.4
quarryWingate Creek MineLithia34.6 mi69.3
quarryCentral State Aggregates LLCZephyrhill40.6 mi81.2
quarryFour CornersLithia41.2 mi82.4
quarrySouth Pasture MineLithia42.6 mi85.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 48.1 mi96.3
transfer stationHOWCO ENV. SERVICES (UOP)St Petersburg5.2 mi10.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0469980-001-EG2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/99e79dda