Approved · unknownMarion County
FDOT — I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S O F SR 200 - REST AREA
Marion County — FDOT Contract T5784
Load estimate pending
Lifecycle
Completed as of Sep 5, 2023
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S O F SR 200 - REST AREA
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$31.2M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S O F SR 200 - REST ARE. Vendor: COMMERCIAL INDUSTRIAL CORP.. Cost: $31,220,433. | FDOT public project (+15) | size signal: $31,220,433 valuation (+20) | FDOT public project (+15) | size signal: $31,220,433 valuation (+20) | FDOT public project (+15) | size signal: $31,220,433 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T5784_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NORTH MINE · OCALA
One-way
5.9 mi
Round trip
11.9 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NORTH MINE | OCALA | 5.9 mi | 11.9 |
| quarry | Stavola NW Pit | Ocala | 11.9 mi | 23.8 |
| quarry | 328 Pit | Ocala | 12.6 mi | 25.3 |
| quarry | Lowell Mine & Mill | Ocala | 15.4 mi | 30.9 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 16.8 mi | 33.6 |
| quarry | Reddick Mine | Pompano Beach | 18.7 mi | 37.4 |
| sand pit | Lynne Mine | Davenport | 18.8 mi | 37.6 |
| quarry | Ocala Quarry | Atlanta | 19.5 mi | 38.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T5784_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Marion
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/99aaea92