Leads/99616259
Approved · planning

PHASED DEVELOPMENT 7ELEVEN

11380 US HIGHWAY 301 S, RIVERVIEW, FL, 33578

Load estimate pending
Lifecycle
Permitted as of May 10, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

PHASED DEVELOPMENT 7ELEVEN

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
GWEN NICHOLAS
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (8y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0364368-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.8 mi
Round trip
19.7 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa9.8 mi19.7~40m$110–$140
quarryCaloosa MaterialsRuskin11.5 mi22.9~55m$140–$175
quarryFour CornersLithia22.4 mi44.7~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill25.5 mi51~100m$230–$290
quarryWingate Creek MineLithia26.4 mi52.8~100m$230–$290
quarrySouth Pasture MineLithia26.7 mi53.4~100m$230–$290
quarrySouth Fort Meade MineLithia37.3 mi74.6~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 39.3 mi78.5~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
GWEN NICHOLAS

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0364368-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/99616259