Leads/97a5c42c
Approved · planning

ROBERDS SFR OUTDOOR LIVING

2925 KEYSTONE RD, TARPON SPRINGS, FL, 34688

Load estimate pending
Lifecycle
Permitted as of Nov 18, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ROBERDS SFR OUTDOOR LIVING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
DANIEL BERGIN
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0455020-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
20.7 mi
Round trip
41.5 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryGeorgia Stone Spring Hill QuarryAtlanta 20.7 mi41.5~75m$175–$230
sand pitCounty Line MineSpring Hill21.0 mi42~75m$175–$230
quarryTampa Cement Grinding PlantTampa21.8 mi43.5~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill25.0 mi50.1~100m$230–$290
quarryBrooksville QuarryBrooksville33.7 mi67.5~100m$230–$290
quarryBrooksville South Cement PlantBrooksville34.4 mi68.9~100m$230–$290
quarryCaloosa MaterialsRuskin34.9 mi69.8~100m$230–$290
quarryCalcium PlantJacksonville37.4 mi74.7~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
DANIEL BERGIN

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0455020-001-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/97a5c42c