Approved · unknown
FDOT — FIRST COAST EXPRESSWAY SAFETY ENHANCEMENTS (CLAY & DUVAL)(MP 31-MP45.7) - SAFETY PROJECT
FL County — FDOT Contract E8V11
Load estimate pending
Lifecycle
Active as of Jul 7, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — FIRST COAST EXPRESSWAY SAFETY ENHANCEMENTS (CLAY & DUVAL)(MP 31-MP45.7) - SAFETY PROJECT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$8.4M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT earthwork contract — FIRST COAST EXPRESSWAY SAFETY ENHANCEMENTS (CLAY & DUVAL)(MP 31-MP45.7) - SAFETY. Vendor: AMERICAN LIGHTING AND SIGNALIZATION, LLC.. Cost: $8,384,255. | FDOT public project (+15) | size signal: $8,384,255 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $8,384,255 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $8,384,255 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E8V11_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
WHITEHOUSE RECYCLING (A/K/A COXWELL MRF) · Jacksonville
One-way
4.7 mi
Round trip
9.3 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
19.6 mi
Round trip
39.2 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dames Point Terminal | Brooksville | 19.6 mi | 39.2 |
| quarry | The Chemours Company FC LLC | Starke | 25.2 mi | 50.3 |
| sand pit | Goldhead Sand Plant | Jacksonville | 29.9 mi | 59.8 |
| sand pit | Grandin Sand Plant | Jacksonville | 36.1 mi | 72.3 |
| quarry | SRM Materials East Palatka | Murfresboro | 43.2 mi | 86.4 |
| sand pit | Keuka Sand Plant | Jacksonville | 43.6 mi | 87.2 |
| quarry | Edgar Minerals, Inc. | Davenport | 45.4 mi | 90.7 |
| transfer station | WHITEHOUSE RECYCLING (A/K/A COXWELL MRF) | Jacksonville | 4.7 mi | 9.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E8V11_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/96591c48