Leads/93146795
Approved · planning

POTTER STREET OFFICE

5316 POTTER ST, SARASOTA, FL, 34232

Load estimate pending
Lifecycle
Permitted as of Jan 21, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

POTTER STREET OFFICE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
WEBER ENGINEERING & SURVEYING INC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0415330-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Wingate Creek Mine · Lithia
One-way
23.8 mi
Round trip
47.6 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryWingate Creek MineLithia23.8 mi47.6~75m$175–$230
quarryCaloosa MaterialsRuskin25.7 mi51.4~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples27.7 mi55.3~100m$230–$290
quarry4M-31 MineAlva37.9 mi75.8~100m$230–$290
quarrySouth Pasture MineLithia38.3 mi76.7~100m$230–$290
sand pitWashington Loop MinePunta Gorda40.4 mi80.7~130m$290–$370
quarryTampa Cement Grinding PlantTampa41.8 mi83.5~130m$290–$370
quarryBermont Materials AlicoPunta Gorda42.1 mi84.3~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
WEBER ENGINEERING & SURVEYING INC

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0415330-001-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/93146795