Leads/928fa4a6
Approved · unknownBroward County

FDOT — WIDEN SAWGRASS (SR869) ATLANTIC BLVD TO SAMPLE RD (MP 9-12)( 6TO10 LNS) - ADD LANES & RECONSTRUCT

Broward County — FDOT Contract E8U45

Load estimate pending
Lifecycle
Active as of Oct 21, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — WIDEN SAWGRASS (SR869) ATLANTIC BLVD TO SAMPLE RD (MP 9-12)( 6TO10 LNS) - ADD LANES & RECONSTRUCT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$101.5M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT earthwork contract — WIDEN SAWGRASS (SR869) ATLANTIC BLVD TO SAMPLE RD (MP 9-12)( 6TO10 LNS) - ADD LA. Vendor: HALLEY ENGINEERING CONTRACTORS, INC.. Cost: $101,523,240. | FDOT public project (+15) | size signal: $101,523,240 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $101,523,240 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $101,523,240 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $101,523,240 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E8U45_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
WHITE ROCK QUARRIES · West Palm Beach
One-way
23.9 mi
Round trip
47.7 mi
TypeNameCityOne-wayRT mi
quarryWHITE ROCK QUARRIESWest Palm Beach23.9 mi47.7
quarryFEC QUARRYMIAMI27.5 mi54.9
quarryPENNSUCO CEMENT PLANTMedley27.6 mi55.2
quarryPENNSUCO QUARRYMedley27.6 mi55.2
quarryPalm Beach Aggregates LLCJacksonville30.7 mi61.5
quarryMiami QuarryJacksonville33.2 mi66.4
quarryMiami Cement PlantMiami34.4 mi68.8
quarryBig Cypress Rock MineClewiston35.0 mi69.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Broward County Permits
Fort Lauderdale area Building Division
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E8U45_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Broward
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/928fa4a6