Approved · unknownAlachua County
FDOT — SR222(39TH AVE) FROM NW 95TH BLVD TO NW 40TH TERRACE - RESUR FACING
Alachua County — FDOT Contract T2968
Load estimate pending
Lifecycle
Completed as of Aug 19, 2024
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR222(39TH AVE) FROM NW 95TH BLVD TO NW 40TH TERRACE - RESUR FACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$10.5M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR222(39TH AVE) FROM NW 95TH BLVD TO NW 40TH TERRACE - RESUR FACING. Vendor: PREFERRED MATERIALS INC.. Cost: $10,539,106. | FDOT public project (+15) | size signal: $10,539,106 valuation (+20) | FDOT public project (+15) | size signal: $10,539,106 valuation (+20) | FDOT public project (+15) | size signal: $10,539,106 valuation (+20) | FDOT public project (+15) | size signal: $10,539,106 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T2968_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NEWBERRY LIMESTONE · Ocala
One-way
9.3 mi
Round trip
18.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NEWBERRY LIMESTONE | Ocala | 9.3 mi | 18.6 |
| quarry | NEWBERRY MINE- LIMESTONE MATERIALS | Ocala | 10.3 mi | 20.7 |
| quarry | LIMESTONE PRODUCTS INCORPORATED | NEWBERRY | 10.5 mi | 20.9 |
| quarry | Newberry Cement Plant | Newberry | 12.5 mi | 24.9 |
| quarry | RALEIGH QUARRY | WILLISTON | 18.7 mi | 37.4 |
| quarry | Levy County Pit | Bronson | 22.0 mi | 43.9 |
| quarry | Ocala Quarry | Atlanta | 23.6 mi | 47.1 |
| quarry | Reddick Mine | Pompano Beach | 25.8 mi | 51.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T2968_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Alachua
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/91e558cc