Leads/917f7d57
Approved · planning

MULTI-SLIP DOCKING FACILITY

5245 S TAMIAMI TRL, SARASOTA, FL, 34231

Load estimate pending
Lifecycle
Permitted as of Feb 4, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

MULTI-SLIP DOCKING FACILITY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
SIESTA KEY AQUA ADVENTURES LLC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0388974-002-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
25.7 mi
Round trip
51.3 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFlorida Shell & Fill Company LLCNaples25.7 mi51.3~100m$230–$290
quarryWingate Creek MineLithia29.2 mi58.4~100m$230–$290
quarryCaloosa MaterialsRuskin29.8 mi59.6~100m$230–$290
quarry4M-31 MineAlva41.4 mi82.7~130m$290–$370
sand pitWashington Loop MinePunta Gorda41.7 mi83.4~130m$290–$370
quarryBermont Materials AlicoPunta Gorda43.4 mi86.8~130m$290–$370
quarrySouth Pasture MineLithia43.8 mi87.6~130m$290–$370
quarryTampa Cement Grinding PlantTampa45.7 mi91.4~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
SIESTA KEY AQUA ADVENTURES LLC

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0388974-002-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/917f7d57