Approved · unknownGadsden County
FDOT — SR 267 FROM SR 20 TO GADSDEN COUNTY LINE - RESURFACING
Gadsden County — FDOT Contract E3Y29
Load estimate pending
Lifecycle
Active as of Oct 28, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR 267 FROM SR 20 TO GADSDEN COUNTY LINE - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$245K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 267 FROM SR 20 TO GADSDEN COUNTY LINE - RESURFACING. Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $244,543. | FDOT public project (+15) | stage=under_construction, recent (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | FDOT public project (+15) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E3Y29_4 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
A-Mining Group II LLC. · Quincy
One-way
6.1 mi
Round trip
12.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | A-Mining Group II LLC. | Quincy | 6.1 mi | 12.3 |
| quarry | Active Minerals Attapulgite Division | Quincy | 13.8 mi | 27.6 |
| quarry | Quincy Plant and Mines | QUINCY | 15.9 mi | 31.8 |
| sand pit | Silver Lake 1 | Tallahassee | 16.1 mi | 32.2 |
| quarry | 1874 Marianna | Hammond | 33.6 mi | 67.2 |
| quarry | ROCKY CREEK MINE AND MILL | Marianna | 34.4 mi | 68.7 |
| sand pit | USA Calcium | Marianna | 44.2 mi | 88.4 |
| quarry | Marianna Hi-Cal / Alternative Materials | Irving | 44.6 mi | 89.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E3Y29_4 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Gadsden
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/8e92bdf0