Leads/8a2e4246
Approved · unknownPINELLAS County

USACE 404 — 854 ISLAND WAY, CLEARWATER

854 ISLAND WAY, CLEARWATER, FL, 33767

Load estimate pending
Lifecycle
Permitted as of Mar 28, 2017
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 854 ISLAND WAY, CLEARWATER

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/28/2017 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.2929 ac
Parcel 33133
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
DEPAOLO, CARMELLO T
Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (9y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0311438-003-EE from fdep_spgp
  2. 2026-07-06PCPAO
    Captured PCPAO_33133_8a2e4246 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
CITY OF CLEARWATER TRANSFER STATION · Clearwater
One-way
5.6 mi
Round trip
11.2 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
23.5 mi
Round trip
47 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa23.5 mi47
quarryCaloosa MaterialsRuskin30.8 mi61.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 33.7 mi67.5
sand pitCounty Line MineSpring Hill33.9 mi67.8
quarryCentral State Aggregates LLCZephyrhill35.2 mi70.3
quarryBrooksville QuarryBrooksville46.7 mi93.4
quarryBrooksville South Cement PlantBrooksville47.4 mi94.8
transfer stationCITY OF CLEARWATER TRANSFER STATIONClearwater5.6 mi11.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DEPAOLO, CARMELLO T

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0311438-003-EE2026-05-28Open ↗
pcpaoPCPAO_33133_8a2e42462026-07-06Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
33133
Strap
05-29-15-43458-000-0560
Address
854 Island Way
Zip
33767
Acreage
0.2929 ac
Sq ft
12,759
Year built
2008
Use
0110 Single Family ...
Subdivision
<span title="ISLAND ESTS OF CLEARWATER UNIT 8">Island Ests Of Clea ...</span>
Owner of record
DEPAOLO, CARMELLO T
DEPAOLO, CRYSTAL D
Last sale
2022-06-01
$5,000,000
Appraiser valuation
Just (market)
$4,449,419
Assessed
$3,891,519
Taxable
$3,840,797

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/8a2e4246