Leads/89692bbb
Approved · unknown

Concrete Block Plant — COMPLETE RESOURSEC COMPANY

10501 Rocket Ct, ORLANDO, FL, 32824

Load estimate pending
Lifecycle
Completed as of Dec 31, 1999
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Concrete Block Plant — COMPLETE RESOURSEC COMPANY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_0950230 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Four Corners Sand Mine · Brooksville
One-way
18.2 mi
Round trip
36.3 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitFour Corners Sand MineBrooksville18.2 mi36.3~75m$175–$230
sand pitCypress SandLexington18.5 mi37~75m$175–$230
sand pitCenter Sand CompanyClermont19.0 mi38~75m$175–$230
sand pitHilochee Sand MineDavenport19.1 mi38.1~75m$175–$230
quarryFLINT PLANTDavenport19.2 mi38.4~75m$175–$230
sand pitDavenport Sand MineBrooksville19.7 mi39.5~75m$175–$230
sand pitSILICA PLANTDavenport20.0 mi40~75m$175–$230
sand pitIndependent MineDavenport20.1 mi40.1~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_09502302026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/89692bbb