Leads/89174038
Approved · unknownMonroe County

Beach nourishment — Rest Beach (200 cy)

Rest Beach, Monroe County, FL

Load estimate pending
Lifecycle
Completed as of Jan 1, 2012
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Beach nourishment — Rest Beach (200 cy)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$2K
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Beach nourishment Rest Beach Nourishment Project — 200 cy placed. Source: Upland. Type: Nourishment. Counties with prior nourishment cycle every 6-10 years.

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SAND_PLACEMENT
    Captured FDEP_SANDPLACE_270 from fdep_sand_placement

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
KEY WEST TRANSFER STATION AND HAULING SERVICE INC · Key West
One-way
3.5 mi
Round trip
7 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
transfer stationKEY WEST TRANSFER STATION AND HAULING SERVICE INCKey West3.5 mi7~25m$85–$110
transfer stationCITY OF KEY WEST SOLID WASTE TRANSFER STATIONKey West7.4 mi14.8~40m$110–$140
transfer stationNEW ROCKLAND RECYCLING CENTERKey West7.4 mi14.9~40m$110–$140
landfillCUDJOE KEY LANDFILLCudjoe Key19.6 mi39.1~75m$175–$230
transfer stationMARATHON TRANSFER STATIONMarathon48.4 mi96.8~130m$290–$370
landfillMount Trashmore3.2 mi6.5~25m$85–$110

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Monroe County Permits
Florida Keys Building Department
ConnectorRecord IDCapturedLink
fdep_sand_placementFDEP_SANDPLACE_2702026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Monroe
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/89174038