Leads/88a950ab
Approved · planning

RECONFIGURE DOCKING FACILITY

208 / 212 / 216 CASEY KEY RD, NOKOMIS, FL, 34275

Load estimate pending
Lifecycle
Permitted as of Jan 11, 2017
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

RECONFIGURE DOCKING FACILITY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
CASEY KEY VENTURE LLC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (9y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0318521-004-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
14.8 mi
Round trip
29.7 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFlorida Shell & Fill Company LLCNaples14.8 mi29.7~55m$140–$175
quarryWingate Creek MineLithia33.2 mi66.5~100m$230–$290
sand pitWashington Loop MinePunta Gorda34.0 mi68~100m$230–$290
quarryBermont Materials AlicoPunta Gorda35.5 mi71~100m$230–$290
quarry4M-31 MineAlva37.8 mi75.7~100m$230–$290
quarryCaloosa MaterialsRuskin39.6 mi79.3~100m$230–$290
sand pitWatermelon PitPunta Gorda44.5 mi89~130m$290–$370
quarryHalls MineNaples44.5 mi89~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
CASEY KEY VENTURE LLC

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0318521-004-EI2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/88a950ab