Leads/87f16c96
Approved · unknown

Beach Erosion — beach_erosion (Alachua Conservation Trust)

-

Load estimate pending
Lifecycle
Permitted as of Feb 5, 2020
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Beach Erosion — beach_erosion (Alachua Conservation Trust)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (beach_erosion) — beach_erosion. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | stage=permit_issued, but stale (6y old) | stage=permit_issued, but stale (6y old) | stage=permit_issued, but stale (6y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_0383555-001-BE from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
FRANKLIN COUNTY CENTRAL LANDFILL · Eastpoint
One-way
15.1 mi
Round trip
30.2 mi · ~75 min
Rate / load
$175–$230
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
43.4 mi
Round trip
86.7 mi · ~130 min
Rate / load
$290–$370
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitSilver Lake 1Tallahassee43.4 mi86.7~130m$290–$370
quarryCYD Cabbage GroveDaytona Beach43.7 mi87.4~130m$290–$370
quarryPerry QuarryFort Myers44.2 mi88.4~130m$290–$370
sand pitA-Mining Group II LLC.Quincy46.1 mi92.1~130m$290–$370
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint15.1 mi30.2~75m$175–$230
landfillFIVE POINTS CLASS III LANDFILLPort St Joe41.2 mi82.5~130m$290–$370
transfer stationINDUSTRIAL ROAD TRANSFER STATIONPort St Joe42.3 mi84.7~130m$290–$370
landfillMARPAN SUPPLY COMPANY INCTallahassee42.6 mi85.2~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_0383555-001-BE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/87f16c96