Approved · unknownPinellas County
FDOT — I-275/SR 93 SB FROM HOWARD FRANKLAND BRIDGE TO REO ST - BIKE PATH/TRAIL
Pinellas County — FDOT Contract E7R10
Load estimate pending
Lifecycle
Active as of Apr 1, 2020
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — I-275/SR 93 SB FROM HOWARD FRANKLAND BRIDGE TO REO ST - BIKE PATH/TRAIL
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$3.0M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — I-275/SR 93 SB FROM HOWARD FRANKLAND BRIDGE TO REO ST - BIKE PATH/TRAIL. Vendor: ARCHER WESTERN/TRAYLOR BROS. JO. Cost: $3,010,000. | FDOT public project (+15) | size signal: $3,010,000 valuation (+12) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $3,010,000 valuation (+12) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $3,010,000 valuation (+12) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $3,010,000 valuation (+12) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E7R10_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
6.2 mi
Round trip
12.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 6.2 mi | 12.5 |
| quarry | Caloosa Materials | Ruskin | 17.8 mi | 35.5 |
| quarry | Central State Aggregates LLC | Zephyrhill | 23.6 mi | 47.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 30.8 mi | 61.6 |
| sand pit | County Line Mine | Spring Hill | 33.8 mi | 67.7 |
| quarry | Four Corners | Lithia | 37.2 mi | 74.3 |
| quarry | Wingate Creek Mine | Lithia | 40.0 mi | 80.1 |
| quarry | South Pasture Mine | Lithia | 41.9 mi | 83.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E7R10_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/87aee6e8