Ready Mix Concrete Plant — TARMAC FLORIDA
Mile Marker 9, US Hwy 1, ISLAMORADA, FL
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0870016 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions
| Type | Name | City | One-way | RT mi | ~Cycle | Rate / load |
|---|---|---|---|---|---|---|
| quarry | SDI Aggregates LLC | Fort Myers | 37.4 mi | 74.9 | ~100m | $230–$290 |
| transfer station | LONG KEY TRANSFER STATION | Long Key | 12.3 mi | 24.7 | ~55m | $140–$175 |
| transfer station | ATLANTIC TRASH AND TRANSFER | Key Largo | 18.9 mi | 37.9 | ~75m | $175–$230 |
| transfer station | MARATHON TRANSFER STATION | Marathon | 27.5 mi | 55 | ~100m | $230–$290 |
| landfill | KEY LARGO TRANSFER STATION AND CLOSED LANDFILL | Key Largo | 30.4 mi | 60.7 | ~100m | $230–$290 |
| transfer station | WM RECYCLING HOMESTEAD MRF AND C&D FACILITY | Homestead | 42.1 mi | 84.1 | ~130m | $290–$370 |
| landfill | FVP C & D LLC | Miami | 47.6 mi | 95.2 | ~130m | $290–$370 |
| landfill | SOUTH DADE LF | Homestead | 47.8 mi | 95.7 | ~130m | $290–$370 |
| See /material-sources for the full directory. | ||||||
Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0870016 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/873b0833