Leads/8719a3d1
Approved · unknownHillsborough County

FDOT — I275 FROM MANATEE COUNTY LINE TO HILLSBOROUGH COUNTY LINE - ITS FREEWAY MANAGEMENT

Hillsborough County — FDOT Contract T7574

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT — I275 FROM MANATEE COUNTY LINE TO HILLSBOROUGH COUNTY LINE - ITS FREEWAY MANAGEMENT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$514K
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT utilities contract — I275 FROM MANATEE COUNTY LINE TO HILLSBOROUGH COUNTY LINE - ITS FREEWAY MANAGEME. Vendor: TRAFFIC MANAGEMENT SOLUTIONS, LLC. Cost: $513,528. | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: $513,528 valuation (+5)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T7574_5 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
HOWCO ENV. SERVICES (UOP) · St Petersburg
One-way
3.6 mi
Round trip
7.3 mi · ~25 min
Rate / load
$85–$110
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
14.7 mi
Round trip
29.4 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin14.7 mi29.4~55m$140–$175
quarryTampa Cement Grinding PlantTampa21.3 mi42.6~75m$175–$230
quarryWingate Creek MineLithia37.1 mi74.1~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill41.4 mi82.7~130m$290–$370
quarryFour CornersLithia43.5 mi87~130m$290–$370
quarrySouth Pasture MineLithia45.0 mi90~130m$290–$370
quarryGeorgia Stone Spring Hill QuarryAtlanta 48.1 mi96.2~130m$290–$370
transfer stationHOWCO ENV. SERVICES (UOP)St Petersburg3.6 mi7.3~25m$85–$110
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T7574_52026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/8719a3d1