Leads/86b87f0a
Approved · unknownBrevard County

FDOT — SR-5 FROM MINNIE LN TO THE VOLUSIA COUNTY LINE - RESURFACING

Brevard County — FDOT Contract E53F3

Load estimate pending
Lifecycle
Completed as of Jan 20, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR-5 FROM MINNIE LN TO THE VOLUSIA COUNTY LINE - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$13.6M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR-5 FROM MINNIE LN TO THE VOLUSIA COUNTY LINE - RESURFACING. Vendor: P & S PAVING, INC.. Cost: $13,608,032. | FDOT public project (+15) | size signal: $13,608,032 valuation (+20) | FDOT public project (+15) | size signal: $13,608,032 valuation (+20) | FDOT public project (+15) | size signal: $13,608,032 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E53F3_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
TITUSVILLE TRANSFER STATION · Titusville
One-way
11.5 mi
Round trip
22.9 mi · ~55 min
Rate / load
$140–$175
Closest import source (quarry)
Beeline Mine · Orlando
One-way
17.4 mi
Round trip
34.7 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryBeeline MineOrlando17.4 mi34.7~75m$175–$230
quarryRock Solid Rock, LLCTitusville18.3 mi36.5~75m$175–$230
quarryS & L Materials IncKISSIMMEE20.6 mi41.2~75m$175–$230
quarryBuck HammockOrlando 44.0 mi88.1~130m$290–$370
transfer stationTITUSVILLE TRANSFER STATIONTitusville11.5 mi22.9~55m$140–$175
transfer stationOSCEOLA RD SOLID WASTE MGMT FACILITY-CLASS I LANDFILLGeneva14.2 mi28.4~55m$140–$175
transfer stationCITY OF EDGEWATER SOLID WASTE TRANSFER STATIONEdgewater17.9 mi35.8~75m$175–$230
landfillKSC SCHWARTZ ROAD LANDFILL CLASS IIIOrlando18.5 mi37~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Brevard County Permits
Melbourne / Titusville Building Dept
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E53F3_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Brevard
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/86b87f0a