Leads/86aae6d1
Approved · unknownSARASOTA County

USACE 404 — MOTE MARINE LABORATORY / 200803 0010 / BAY (R)

1600 KEN THOMPSON PKWY**, SARASOTA, FL, 34236

Load estimate pending
Lifecycle
Permitted as of Jun 9, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — MOTE MARINE LABORATORY / 200803 0010 / BAY (R)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | single-trade residential permit — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0133494-003-EI from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
26.9 mi
Round trip
53.8 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin26.9 mi53.8~100m$230–$290
quarryWingate Creek MineLithia30.1 mi60.2~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples30.3 mi60.7~100m$230–$290
quarryTampa Cement Grinding PlantTampa42.4 mi84.9~130m$290–$370
quarrySouth Pasture MineLithia44.2 mi88.5~130m$290–$370
quarry4M-31 MineAlva44.8 mi89.6~130m$290–$370
sand pitWashington Loop MinePunta Gorda46.2 mi92.3~130m$290–$370
quarryFour CornersLithia47.6 mi95.2~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0133494-003-EI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
SARASOTA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/86aae6d1