Leads/865ac3ff
Approved · unknownPINELLAS County

State 404 — 42ND AVE. N. FROM 46 ST. N TO 35TH ST. N., ST. PETERSBURG

42ND AVE. N., ST. PETERSBURG, FL, 33714

Load estimate pending
Lifecycle
Permitted as of May 13, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — 42ND AVE. N. FROM 46 ST. N TO 35TH ST. N., ST. PETERSBURG

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0410216-001-SFG from fdep_state404

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
16.9 mi
Round trip
33.8 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin16.9 mi33.8~75m$175–$230
quarryTampa Cement Grinding PlantTampa17.3 mi34.7~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill36.2 mi72.5~100m$230–$290
quarryWingate Creek MineLithia40.7 mi81.4~130m$290–$370
quarryGeorgia Stone Spring Hill QuarryAtlanta 41.6 mi83.1~130m$290–$370
sand pitCounty Line MineSpring Hill43.6 mi87.1~130m$290–$370
quarryFour CornersLithia44.0 mi87.9~130m$290–$370
quarrySouth Pasture MineLithia46.7 mi93.4~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0410216-001-SFG2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/865ac3ff