Leads/856d9ba1
Approved · planning

CROSS BAYOU SUBAQUEOUS CROSSIN

SEE DIRECTIONS, SEMINOLE, FL, 33777

Load estimate pending
Lifecycle
Permitted as of Nov 14, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CROSS BAYOU SUBAQUEOUS CROSSIN

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 11/14/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
DUKE ENERGY FLORIDA INC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0450332-001-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
CLEARWATER MATERIALS TRANSFER FACILITY · Clearwater
One-way
4.4 mi
Round trip
8.9 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
20.3 mi
Round trip
40.6 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa20.3 mi40.6
quarryCaloosa MaterialsRuskin21.3 mi42.6
quarryCentral State Aggregates LLCZephyrhill37.9 mi75.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 41.4 mi82.8
sand pitCounty Line MineSpring Hill42.8 mi85.6
quarryWingate Creek MineLithia45.1 mi90.1
quarryFour CornersLithia48.2 mi96.3
transfer stationCLEARWATER MATERIALS TRANSFER FACILITYClearwater4.4 mi8.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DUKE ENERGY FLORIDA INC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0450332-001-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/856d9ba1