Leads/8543ec63
Approved · unknown

Concrete Block Plant — PIONEER CONCRETE TILE

10923 ENTERPRISE AVENUE, BONITA SPRINGS, FL, 33923

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Concrete Block Plant — PIONEER CONCRETE TILE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Concrete Block Plant INACTIVE (shutdown unknown). | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_0710070 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Fort Myers Quarry · Fort Myers
One-way
10.9 mi
Round trip
21.9 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFort Myers QuarryFort Myers10.9 mi21.9~55m$140–$175
sand pit846 Mine LLCNaples11.6 mi23.1~55m$140–$175
quarryALICO ROAD QUARRYMiami11.5 mi23.1~55m$140–$175
quarryFort Myers MineJacksonville11.8 mi23.6~55m$140–$175
quarryGolden Gate QuarryDaytona Beach, FL12.6 mi25.1~55m$140–$175
sand pitCorkscrewEstero14.2 mi28.4~55m$140–$175
quarryBell MineFort Myers17.4 mi34.8~75m$175–$230
quarrySunniland MineNaples22.0 mi44~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_07100702026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/8543ec63