Leads/7fb5f214
Approved · unknown

Limestone Quarry — ROCKYARD

3500 NW 79th St, MIAMI, FL, 33147

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Limestone Quarry — ROCKYARD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Limestone Quarry INACTIVE (shutdown unknown). | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_7775839 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Epic Stoneworks, Inc. · Cutler Bay
One-way
6.7 mi
Round trip
13.5 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryEpic Stoneworks, Inc.Cutler Bay6.7 mi13.5~40m$110–$140
quarryFEC QUARRYMIAMI7.0 mi14.1~40m$110–$140
quarryPENNSUCO CEMENT PLANTMedley7.4 mi14.9~40m$110–$140
quarryPENNSUCO QUARRYMedley7.4 mi14.9~40m$110–$140
quarryMiami QuarryJacksonville8.9 mi17.7~40m$110–$140
quarryWHITE ROCK QUARRIESWest Palm Beach11.0 mi22~55m$140–$175
quarryMiami Cement PlantMiami11.2 mi22.3~55m$140–$175
quarryKrome QuarryMIAMI18.0 mi36~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_77758392026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/7fb5f214