Leads/7ed0542e
Approved · planning

CHRIS COOPER

6150 9TH AVENUE CIR NE, BRADENTON, FL, 34212

Load estimate pending
Lifecycle
Permitted as of Mar 24, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CHRIS COOPER

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
CHRIS COOPER
Why this is a hauling opportunity: Base unknown/other (20) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0345299-002-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
13.3 mi
Round trip
26.6 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin13.3 mi26.6~55m$140–$175
quarryWingate Creek MineLithia22.4 mi44.8~75m$175–$230
quarryTampa Cement Grinding PlantTampa29.2 mi58.4~100m$230–$290
quarrySouth Pasture MineLithia34.3 mi68.6~100m$230–$290
quarryFour CornersLithia36.0 mi72.1~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples40.4 mi80.7~130m$290–$370
quarry4M-31 MineAlva43.9 mi87.8~130m$290–$370
quarrySouth Fort Meade MineLithia45.8 mi91.7~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
CHRIS COOPER

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0345299-002-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/7ed0542e