Approved · unknownSt. Lucie County
FDOT — SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 - BRIDGE REPLAC EMENT
St. Lucie County — FDOT Contract T4583
Load estimate pending
Lifecycle
Active as of May 1, 2023
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 - BRIDGE REPLAC EMENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$116.7M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 - BRIDGE REPLAC EMENT. Vendor: VECELLIO & GROGAN, INC.. Cost: $116,684,061. | FDOT public project (+15) | size signal: $116,684,061 valuation (+20) | FDOT public project (+15) | size signal: $116,684,061 valuation (+20) | FDOT public project (+15) | size signal: $116,684,061 valuation (+20) | FDOT public project (+15) | size signal: $116,684,061 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T4583_2 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Capron Trails Mine · Jupiter
One-way
10.2 mi
Round trip
20.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Capron Trails Mine | Jupiter | 10.2 mi | 20.4 |
| quarry | Fort Pierce Mine | Jacksonville | 17.6 mi | 35.2 |
| sand pit | Blue Goose Mine | Fort Pierce | 19.1 mi | 38.2 |
| sand pit | Vero Rock and Sand | Vero Beach | 19.7 mi | 39.5 |
| sand pit | Palm City Mine | Greenacres | 27.5 mi | 55 |
| quarry | 1412 Canal Point | Hammond | 28.8 mi | 57.5 |
| sand pit | Sunshine Mine | Fort Pierce | 30.5 mi | 61.1 |
| sand pit | MC320 Mine | Palm City | 30.6 mi | 61.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T4583_2 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- St. Lucie
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/7d9a4854