USACE 404 — EMBANKMENT STABILIZATION & EROSION MITIGATION
8180 CORTEZ BLVD, SPRING HILL, FL, 34607
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 10/24/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_SPGPCaptured FDEP_SPGP_0460035-002-EI from fdep_spgp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 6.3 mi | 12.5 |
| quarry | Brooksville Quarry | Brooksville | 9.8 mi | 19.7 |
| quarry | Brooksville South Cement Plant | Brooksville | 10.8 mi | 21.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 11.1 mi | 22.2 |
| quarry | Calcium Plant | Jacksonville | 12.6 mi | 25.1 |
| quarry | Center Hill Mine | Brooksville | 17.4 mi | 34.8 |
| quarry | Lecanto Mine | Crystal River | 21.1 mi | 42.2 |
| quarry | Maylen Mine | Crystal River | 24.5 mi | 48.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_spgp | FDEP_SPGP_0460035-002-EI | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- HERNANDO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/7cc3b4cf