Leads/7791e6dd
Approved · application_filed

4634 EBBTIDE LN

4634 EBBTIDE LN, PORT RICHEY, FL, 34668

Load estimate pending
Lifecycle
Filed as of May 18, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

4634 EBBTIDE LN

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
LEEANN BERNARDINI
Why this is a hauling opportunity: Base unknown/other (20) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0331569-004 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.1 mi
Round trip
30.3 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill15.1 mi30.3~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.1 mi34.2~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill27.4 mi54.7~100m$230–$290
quarryBrooksville QuarryBrooksville28.1 mi56.1~100m$230–$290
quarryBrooksville South Cement PlantBrooksville28.9 mi57.8~100m$230–$290
quarryTampa Cement Grinding PlantTampa29.4 mi58.7~100m$230–$290
quarryCalcium PlantJacksonville31.5 mi62.9~100m$230–$290
quarryCenter Hill MineBrooksville35.5 mi71~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
LEEANN BERNARDINI

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0331569-0042026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/7791e6dd