Leads/7769435f
Approved · unknown

Limestone Quarry — UBD

12849 Philips Hwy, JACKSONVILLE, FL, 32256

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Limestone Quarry — UBD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Operating limestone quarry — supplier/customer location for haulers. | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_7776144 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
STRATTON ROAD CLASS I TRANSFER STATION · St Augustine
One-way
8.3 mi
Round trip
16.6 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
17.7 mi
Round trip
35.4 mi
TypeNameCityOne-wayRT mi
quarryDames Point TerminalBrooksville17.7 mi35.4
quarrySRM Materials East PalatkaMurfresboro31.3 mi62.5
sand pitGoldhead Sand PlantJacksonville34.8 mi69.5
quarryThe Chemours Company FC LLCStarke36.1 mi72.2
sand pitGrandin Sand PlantJacksonville37.5 mi74.9
sand pitKeuka Sand PlantJacksonville43.2 mi86.4
quarryEdgar Minerals, Inc.Davenport45.4 mi90.7
transfer stationSTRATTON ROAD CLASS I TRANSFER STATIONSt Augustine8.3 mi16.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_77761442026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/7769435f