Approved · unknownGulf County
FDOT — SR 71 CECIL G COSTINS BLVD FROM SR 30 (US 98) TO S OF P.O. E NTRANCE - RESURFACING
Gulf County — FDOT Contract T3975
Load estimate pending
Lifecycle
Active as of Dec 17, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR 71 CECIL G COSTINS BLVD FROM SR 30 (US 98) TO S OF P.O. E NTRANCE - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$2.1M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 71 CECIL G COSTINS BLVD FROM SR 30 (US 98) TO S OF P.O. E NTRANCE - RESURFACI. Vendor: C.W. ROBERTS CONTRACTING, INC.. Cost: $2,080,106. | FDOT public project (+15) | size signal: $2,080,106 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $2,080,106 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $2,080,106 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $2,080,106 valuation (+12) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T3975_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
INDUSTRIAL ROAD TRANSFER STATION · Port St Joe
One-way
2.0 mi
Round trip
4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| transfer station | INDUSTRIAL ROAD TRANSFER STATION | Port St Joe | 2.0 mi | 4 |
| landfill | FIVE POINTS CLASS III LANDFILL | Port St Joe | 2.2 mi | 4.5 |
| transfer station | FRANKLIN COUNTY CENTRAL LANDFILL | Eastpoint | 28.4 mi | 56.8 |
| landfill | TRASH ROLLOFF OF BAY COUNTY INC. PIT | Youngstown | 36.3 mi | 72.7 |
| landfill | BYRD LAND CLEARING DEBRIS DISPOSAL FACILITY | Southport | 42.2 mi | 84.5 |
| landfill | LYNN HAVEN C&D DISPOSAL FACILITY | Panama City | 42.7 mi | 85.5 |
| landfill | BLOUNTSTOWN C&D DISPOSAL FACILITY | Blountstown | 43.0 mi | 86 |
| transfer station | COASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO) | Panama City Beach | 43.3 mi | 86.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T3975_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Gulf
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/774acbdd