Leads/7632d836
Approved · unknownPOLK County

State 404 — CASCADES SUBDIVISION W. OF HWY 27, DAVENPORT

WEST OF HIGHWAY 27, DAVENPORT, FL, 33837

Load estimate pending
Lifecycle
Permitted as of Dec 28, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — CASCADES SUBDIVISION W. OF HWY 27, DAVENPORT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0398221-004-SFI from fdep_state404

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
SILICA PLANT · Davenport
One-way
3.8 mi
Round trip
7.5 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitSILICA PLANTDavenport3.8 mi7.5~25m$85–$110
sand pitDavenport Sand MineBrooksville3.9 mi7.9~25m$85–$110
quarryFLINT PLANTDavenport4.2 mi8.4~25m$85–$110
sand pitGator Sand MineBrooksville5.1 mi10.2~40m$110–$140
sand pitCypress SandLexington8.4 mi16.8~40m$110–$140
sand pitHaines City MineDavenport8.8 mi17.5~40m$110–$140
sand pitGreen Bay MineDavenport9.3 mi18.6~40m$110–$140
sand pitHilochee Sand MineDavenport13.0 mi26~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0398221-004-SFI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
POLK
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/7632d836