Leads/75c62bb4
Approved · unknown

CCCL — Fences - Sand Collecting (Gioseppe Colianni)

FL coastal — CCCL -8036777

Load estimate pending
Lifecycle
Permitted as of Apr 8, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Fences - Sand Collecting (Gioseppe Colianni)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/8/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8036777 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
ANGELO'S RECYCLED MATERIALS - LARGO MRF · Largo
One-way
4.9 mi
Round trip
9.8 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
24.9 mi
Round trip
49.7 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa24.9 mi49.7
quarryCaloosa MaterialsRuskin28.7 mi57.5
quarryCentral State Aggregates LLCZephyrhill39.4 mi78.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 39.5 mi79.1
sand pitCounty Line MineSpring Hill39.9 mi79.9
landfillANGELO'S RECYCLED MATERIALS - LARGO MRFLargo4.9 mi9.8
transfer stationGREEN ENERGY TRANSPORT TRANSFER STATION (FKA WALKER HAULING)Clearwater7.6 mi15.3
transfer stationCLEARWATER MATERIALS TRANSFER FACILITYClearwater8.2 mi16.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80367772026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/75c62bb4