Leads/75a8448f
Approved · planning

HARBORPOINTE MARINA SLIP #36

4502 HARBOR POINTE DRIVE, PORT RICHEY, FL, 34668

Load estimate pending
Lifecycle
Permitted as of Jun 14, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

HARBORPOINTE MARINA SLIP #36

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
HARBORPOINTE MARINA ASSOC., INC.
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0203602-009-EM from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
14.9 mi
Round trip
29.9 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill14.9 mi29.9~55m$140–$175
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.0 mi34.1~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill27.6 mi55.2~100m$230–$290
quarryBrooksville QuarryBrooksville27.8 mi55.7~100m$230–$290
quarryBrooksville South Cement PlantBrooksville28.7 mi57.4~100m$230–$290
quarryTampa Cement Grinding PlantTampa29.8 mi59.6~100m$230–$290
quarryCalcium PlantJacksonville31.2 mi62.5~100m$230–$290
quarryCenter Hill MineBrooksville35.3 mi70.6~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
HARBORPOINTE MARINA ASSOC., INC.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0203602-009-EM2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/75a8448f