Approved · unknownOrange County
FDOT — I-4/SR 400 FROM EAST OF SR-535 TO WEST OF SR-535- INTERCHANG E JUSTIFICA/MODIFCA
Orange County — FDOT Contract E55B8
Load estimate pending
Lifecycle
Active as of Oct 6, 2023
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — I-4/SR 400 FROM EAST OF SR-535 TO WEST OF SR-535- INTERCHANG E JUSTIFICA/MODIFCA
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$180K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — I-4/SR 400 FROM EAST OF SR-535 TO WEST OF SR-535- INTERCHANG E JUSTIFICA/MODIFCA. Vendor: LANE CONSTRUCTION CORPORATION (THE). Cost: $180,000. | FDOT public project (+15) | FDOT public project (+15) | FDOT public project (+15) | FDOT public project (+15)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E55B8_3 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Cypress Sand · Lexington
One-way
11.3 mi
Round trip
22.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Cypress Sand | Lexington | 11.3 mi | 22.6 |
| sand pit | Hilochee Sand Mine | Davenport | 12.0 mi | 24 |
| sand pit | Four Corners Sand Mine | Brooksville | 12.2 mi | 24.4 |
| quarry | FLINT PLANT | Davenport | 13.6 mi | 27.1 |
| sand pit | Gator Sand Mine | Brooksville | 13.8 mi | 27.5 |
| sand pit | Green Bay Mine | Davenport | 13.8 mi | 27.6 |
| sand pit | Center Sand Company | Clermont | 14.1 mi | 28.2 |
| sand pit | Davenport Sand Mine | Brooksville | 14.1 mi | 28.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E55B8_3 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Orange
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/7567fd6b