Joint Coastal Permit — joint_coastal_permit (U.S. Army Corps of Engineers)
SL-098
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 3/10/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_COASTAL_ENVCaptured FDEP_COASTAL_ENV_0154626-010-JN from fdep_coastal_env
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Palm City Mine | Greenacres | 16.0 mi | 31.9 |
| quarry | Fort Pierce Mine | Jacksonville | 17.9 mi | 35.7 |
| sand pit | MC320 Mine | Palm City | 20.9 mi | 41.8 |
| quarry | 1412 Canal Point | Hammond | 22.4 mi | 44.9 |
| quarry | Capron Trails Mine | Jupiter | 23.4 mi | 46.7 |
| quarry | Five Stones Mine, LLC. | Tinton Falls | 33.5 mi | 67.1 |
| sand pit | Blue Goose Mine | Fort Pierce | 33.7 mi | 67.5 |
| sand pit | Vero Rock and Sand | Vero Beach | 34.4 mi | 68.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_coastal_env | FDEP_COASTAL_ENV_0154626-010-JN | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/746c7d4c