Leads/73371c42
Approved · unknownCitrus County

Mitigation bank — Nature Coast (200 ac)

Nature Coast, Citrus County, FL

Load estimate pending
Lifecycle
Permitted as of Dec 8, 2017
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mitigation bank — Nature Coast (200 ac)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/8/2017 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Mitigation bank — 200 ac of wetland restoration. Multi-year project with fill / grading / water control structures. Contact: Sharon Collins. | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_MITIGATION_BANKS
    Captured FDEP_MITBANK_42778.000 from fdep_mitigation_banks

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Amrize Crystal River Quarry · CRYSTAL RIVER
One-way
8.4 mi
Round trip
16.9 mi
TypeNameCityOne-wayRT mi
quarryAmrize Crystal River QuarryCRYSTAL RIVER8.4 mi16.9
quarryLecanto MineCrystal River9.3 mi18.5
quarryMaylen MineCrystal River10.0 mi19.9
quarryRed Level MineCrystal River12.3 mi24.7
quarryInglis QuarryBrooksville16.1 mi32.1
quarryCalcium PlantJacksonville16.4 mi32.7
quarryManko Co Sec 5 Mine/PhosOcala17.8 mi35.7
quarryBrooksville QuarryBrooksville18.2 mi36.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Citrus County Permits
Inverness / Crystal River Building
ConnectorRecord IDCapturedLink
fdep_mitigation_banksFDEP_MITBANK_42778.0002026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Citrus
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/73371c42