Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — AMOCO #838
753 E FOWLER AVE, TAMPA, FL, 33612
~8loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 11, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — AMOCO #838
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.03 ac
Parcel 0948920010
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87942912 from fdep_cleanup_sites
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87983777 from fdep_cleanup_sites
- 2026-06-19HCPACaptured HCPA_0948920010_0eddb622 from hcpa
- 2026-06-21HCPACaptured HCPA_0948920010_73211cf7 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
8.2 mi
Round trip
16.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 8.2 mi | 16.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 14.1 mi | 28.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 23.1 mi | 46.1 |
| quarry | Caloosa Materials | Ruskin | 24.2 mi | 48.5 |
| sand pit | County Line Mine | Spring Hill | 27.1 mi | 54.2 |
| quarry | Four Corners | Lithia | 35.5 mi | 71.1 |
| quarry | Brooksville Quarry | Brooksville | 36.6 mi | 73.1 |
| quarry | West Florida Aggregate | Webster | 36.8 mi | 73.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87942912 | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87983777 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_0948920010_0eddb622 | 2026-06-19 | Open ↗ |
| hcpa | HCPA_0948920010_73211cf7 | 2026-06-21 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 0948920010
- Strap
- A-13-28-18-ZZZ-000005-35010.1
- Address
- 753 E FOWLER AVE, TAMPA
- Zip
- 33612
- Acreage
- 0.03 ac
- Sq ft
- 1,308
- Homestead
- NO
Owner of record
FOWLER AVENUE LLC
Last sale
2010-01-12
$101,600
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/73211cf7